Three-layer structure floor Construction plan, Unspecified beam top elevations are 11.110m., Indicates that the steel beam is hinged to the connected beam. The remaining unspecified beam-column and beam-to-beam connections are just connected.
Raft foundation layout pla
Single wall block construc
Details of beam structure
Apartment floor framing pl
Wall construction prefabri
Foundation and roof struct
Different sections of copi
RCC detailing of tunnel cr
Canopy blocking cad struct
Percolation well yzanja pl
Tower base with detail Aut
Roofing section detail 2d